Richardson

City of Richardson · Dallas & Collin Counties

Research summary, not legal advice. Check Zoning Atlas for special permits and planned development districts on each parcel.[2]

Telecom Corridor / office & retail pads

Richardson targets office lunch and commuter traffic. Base districts include C-M (Commercial), O-M (Office), LR-M (Local Retail), and numerous PD districts with custom use tables.[3]

Permits & process

StepRequirementNotes
1. ZoningInteractive Zoning Atlas + CZO use tables[2][3]Special permits shown on atlas with ordinance PDFs[2]
2. Certificate of OccupancyRequired for new business or tenant/use change[4]Development Services — zoning, site, building, fire review[4]
3. Food Service PermitRichardson Health Department[1]Annual; nontransferable on ownership change[1]
4. Plan review$300 one-time (new/remodel)[1]Paid with health permit application[1]
5. Permit fee (annual)$250 (0–2,000 sq ft) · $350 (2,001–7,500 sq ft)[1]The Lone Volt likely $250 tier
6. Grease trap fee+$50 if grease trap installed[1]Confirm necessity for beverage-only prep
7. Change of ownership+$175 one-time[1]New permit required[1]
8. Sign permitSign Control ordinance[4]Separate from health permit

Richardson-specific considerations

References

Inline [n] markers above link to these sources. Accessed September 2026.

  1. [1]Richardson Food Service PermitFees by sq ft ($250–$450); plan review $300; grease trap $50; change of ownership $175.
  2. [2]Richardson Interactive Zoning AtlasBase zoning, special permits, PD ordinance PDFs.
  3. [3]Comprehensive Zoning Ordinance (CZO)C-M, O-M, LR-M districts; Art. XXII-A Special Permits.
  4. [4]Certificate of Occupancy Application (PDF)Restaurant use types; drive-thru special permit; express permitting note.